Gas distribution through gas pipeline network infrastructure is one of the means to deliver natural gas from upstream to downstream to meet domestic natural gas needs. For this reason, Pertagas Niaga cooperates with Cooperation Contract Contractors (KKKS) producing gas in Indonesia managed by Upstream Subholding and other KKKS to obtain supplies for consumer needs.
The distribution of gas is then carried out by utilizing an extensive network of transmission and distribution pipelines affiliated with Pertamina Gas Subholding and other transporters to reach final consumers such as factories, industrial estates, independent power plants, and other gas consumers. With components transparent prices and customer satisfaction oriented, Pertagas Niaga is trusted to meet domestic natural gas needs in Indonesia.
LNG Arun Station PT Perta Arun Gas
LNG Reception and Regasification
Transmision Pipeline PT Pertamina Gas
Arun - Belawan - KIM - KEK Sei Mangkei Section
Pipe Length : 617 km
Transmision Pipeline PT Pertamina Gas
Duri - DUmai Section
Pipe Length: 67 km
Transmision Pipeline PT Pertamina Gas
Sumatera Selatan Section
Pipe Length : 658 km
Transmision Pipeline PT Pertamina Gas
Central Java Section
Pipe Length : 773 km
Transmision Pipeline PT Pertamina Gas
East Java Section
Pipe Length : 773 km
Transmision Pipeline PT Pertamina Gas
East Kalimantan Section
Pipe Length : 71 km
INFRASTRUCTURE
- Arun LNG Terminal LNG Reception and Regasification | - Transmission Pipe Jawa Barat |
- Transmission Pipeline Aceh - Sumatera Utara | - Transmission Pipeline Jawa Tengah dan Jawa Timur |
- Transmission Pipeline Dumai - Riau | - Transmission Pipeline Kalimantan Timur |
- Transmission Pipeline Sumatera Selatan |